This function should be selectable by user as not all users of SI would require it. This would be excellent for tracking time with project designers and engineers, and the option to split the time between project statuses would be advantageous so that pre-sales design can be separately calculated. Once a project is accepted and opened for editing, a prompt can automatically pop up to ask if the user would like to apply the time to a new/existing CO or subtract from the calculated design time of the accepted project when developing drawings. If two or more project editors are opened at one time, SI can prompt you to make a project inactive and pause time or continue tracking time for both when changes are made in the other project editor.